Skip to content
Home Timeline

A century of change

Michigan Central Station Timeline

Key dates from the Detroit–Windsor rail tunnel and 1913 opening through closure, abandonment, restoration, and reopening.

Timeline summary

When did the Detroit train station open, close, and reopen?

Michigan Central Station entered service in December 1913, closed after its final passenger departure in January 1988, was purchased by Ford in 2018, and reopened after restoration in June 2024.

1910

Detroit–Windsor rail tunnel opens

The tunnel helps drive the need for a larger passenger terminal connected to cross-border rail traffic.

1913

Michigan Central Station enters service

The new station opens on December 26 after a fire destroys the older Third Street depot.

1910s–40s

Detroit’s grand rail gateway

The terminal becomes the city’s primary passenger depot and handles thousands of travelers on busy days.

1950s

Passenger rail begins a long decline

Automobiles, highways, and commercial aviation reshape travel, reducing traffic through the station.

1968

Ownership changes begin

The station passes through changing railroad ownership while services and occupied areas continue to shrink.

1971

Amtrak takes over passenger service

The national passenger rail corporation operates from the station during its final working decades.

1975

National Register listing

Michigan Central Station is added to the National Register of Historic Places on April 16.

1988

The final passenger train departs

The last train leaves for Chicago on January 5, and the station closes.

1988–2018

Three decades of vacancy

Redevelopment ideas come and go while exposure, theft, vandalism, and neglect damage the landmark.

2018

Ford purchases the station

Ford acquires the property and announces plans for Michigan Central, a technology and cultural district.

2018–2024

Historic restoration

More than 3,000 skilled tradespeople contribute to stabilization, conservation, reconstruction, and modernization.

June 2024

Michigan Central Station reopens

The restored ground floor welcomes the public back and begins a new era for the building.

Today

A technology and cultural hub

The station anchors a 30-acre campus with workspaces, public areas, arts, retail, events, and mobility innovation.

Understanding the dates

Some historical sources distinguish between the station’s emergency opening, later dedication, ownership transfers, and different stages of restoration. This timeline emphasizes dates with the clearest relevance to public use and the building’s major transitions.

Review the sources used for this timeline →